top of page
Untitled design - 2024-10-08T083936.724.png

As-Built Services

At Archi Partners Design, we offer comprehensive as-built services to document your existing property with precision. Our team meticulously captures the current conditions of your space, providing a detailed foundation for any renovation, remodel, or new design project.

Untitled design - 2024-10-08T083915.750.png

What Are As-Built Plans?

As-built plans are accurate representations of the current state of your property, including dimensions, layout, and structure. They are essential for ensuring that any future design or construction work is based on the real conditions of the building.

Our As-Built Process

On-Site Property Assessment

We begin by conducting a thorough on-site inspection, measuring and documenting every aspect of the building.

Digital Documentation

We deliver the as-built plans in digital formats, making it easy to share and integrate with future design plans.

Detailed As-Built Drawings

Our team creates precise as-built drawings, which include floor plans, elevations, and any structural details that are critical to the project.

Foundation for Future Design

Once the as-built plans are ready, they serve as the basis for your project’s design phase, ensuring accuracy and preventing costly errors during construction.

Untitled design - 2024-10-08T085146.623.png

Why Choose Us for As-Built Services?

Accuracy & Precision

Our experienced team uses advanced tools and techniques to capture every detail, ensuring your as-built plans are a true reflection of the existing space.

Seamless Design Integration

These plans provide a smooth transition into the design phase, allowing for efficient project planning.

Save Time & Money

Accurate as-built plans minimize the risk of errors and ensure that your project moves forward without costly surprises.

SUBSCRIBE

Sign up to receive quaterly promotion and updates.

Thanks for submitting!

© 2023 by Archi Partners Design

Our drafting services are provided to assist clients in visualizing their projects and preparing detailed plans for construction. Please note that we are not licensed architects or engineers. While our team is skilled in creating precise and high-quality drafting solutions, all plans requiring professional certification or compliance with local building codes will be reviewed, approved, and sealed by a licensed architect and/or engineer as needed.

We collaborate closely with licensed professionals to ensure your plans meet all necessary legal, safety, and structural requirements. This partnership guarantees that your project adheres to all applicable regulations and standards.

For questions regarding the licensing or certification of your project, feel free to contact us directly. We are committed to providing reliable and compliant drafting services tailored to your needs.

  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page