Skip to main content

Service · MEP.06

MEP coordination

We don’t stamp MEP — we coordinate it. Sub-consultant management, conflict detection.

TRUSTED BY BUILDERS NATIONWIDE

  • 200+

    Permit sets filed

  • 50

    U.S. states active

  • 8

    Years drawing

  • 14 days

    Typical turnaround

  • EN · ES · 中

    Languages we work in

What we do

MEP is the most common drafting failure point. We don’t stamp MEP — we coordinate it. We size loads to a Manual J/D/S level of confidence, write the scope for the engineer, run conflict detection between architectural and MEP backgrounds, and hand the GC a set that actually builds.

  • Manual J/D/S load sizing and HVAC narrative
  • Coordinated sub-consultant scope writing
  • Conflict detection on architectural backgrounds
  • IECC 2024 climate zone 2 compliance pathway

What you get

  • Architectural background ready for MEP drafting
  • Load sizing summary and HVAC narrative
  • IECC compliance worksheet
  • Plumbing fixture-unit count and gas demand
  • Electrical service-size calc and panel schedule scope
  • Conflict-detection report on the merged set

Phoenix specifics

Climate zone 2 in AZ means cooling-dominated load profiles and tight envelope thresholds under IECC 2024. We pick the prescriptive vs. performance path that minimises corrections, and we know which mechanical engineers in town are fast vs. thorough — we partner accordingly.

Pricing

Typical engagement: $2,500–$9k. Fixed-fee on most projects.

FAQ

Frequently asked questions

  • What does "MEP coordination" include exactly?

    Coordinating mechanical (HVAC), electrical, and plumbing layouts between the trade engineers and the architectural set so nothing collides on site. We mark conflicts (a duct routed through a beam, a plumbing chase too small for the riser, a panel feeder that needs a new circuit), issue RFIs to the relevant trade, and incorporate resolved decisions into the architectural drawings.

  • Do you do MEP design from scratch, or only coordinate?

    Both, depending on the project. Small commercial TI: we produce permit-set MEP layouts ourselves with our partner stamped MEP engineer reviewing. Larger commercial / multifamily: each MEP trade is its own design firm; we coordinate their drawings, not produce them.

  • Can you join my project's coordination meetings?

    Yes — typically a weekly 30-minute call during the active coordination phase. Included in the fee for projects we're producing the architectural set on; itemized on the quote for coordination-only engagements.

  • Do you stamp drawings?

    We are a drafting studio, not a licensed architecture or engineering firm. For projects that need a stamp, we partner with licensed architects and engineers in your state and route the drawings through them. The cost of the stamp is itemized separately on your quote so there are no surprises.

  • Do you submit permits on my behalf?

    Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the stamped set and submit it yourself. Your call; either way, the drawing scope is the same.

  • What is your revision policy?

    Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. AHJ corrections (changes the city asks for after submittal) are bundled in — we don't charge extra for plan-check responses. Substantive scope changes after CD freeze are quoted separately at the hourly rate.

  • Can you work with my existing GC, engineer, or interior designer?

    Yes — most of our projects come in this way. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.

  • How fast can you turn around a set?

    Typical permit-set turnaround is 2–5 weeks from a complete brief; complex commercial TI or multifamily can stretch to 8–12 weeks. We commit to dates in writing on the quote and hold them — late-delivery credits are part of the contract.

  • What languages do you work in?

    English, Spanish, and Mandarin. Drafters in all three on staff. We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.

MEP COORDINATION

Wrangling MEP sub-consultants? We'll coordinate.

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

MEP coordination — Phoenix architectural drafting · Archipartners Design