Skip to main content

About

Built by drafters, for builders.

Collaborative Excellence in Design

An eight-person Phoenix-based studio working in all 50 states — we spend our days inside the IBC, the IRC, and every state amendment — so your contractor can spend theirs breaking ground.

How we got here

A focused practice. No black box.

Archipartners Design started in 2018 with a simple frustration: every drafting firm in the Valley felt like a black box. You sent a sketch, you waited four weeks, and you got back something that almost worked. We thought there was a better way to run a drafting studio — faster, more transparent, and obsessed with the code.

Today we are eight people in Phoenix, drawing for clients in all 50 states. Senior drafters, a permit specialist, a coordinator. Every set ships through senior review before it leaves the building. Nothing gets sent offshore. Nothing gets junior-staffed. We work in English, Spanish, and Chinese, carry our own E&O, and answer the phone.

  • 2018Year founded
  • 530+Projects shipped
  • 12States served
  • EN · ES · 中Languages spoken

Anchored in Phoenix · Drawing in every U.S. state

One bench. Fifty jurisdictions. Every code memo signed by hand.

How we operate

Four principles. Non-negotiable.

We hire, draft, and quote against these. They are the difference between a set that ships and a set that sits on a plan-checker’s desk.

01

Ship faster, fix less

Permit-ready sets the first time. Clean code analysis upfront so revisions stay rare and your contractor stays on schedule.

02

Trilingual by default

English, Spanish, and Chinese on every interaction — intake bot, contract, portal, shop drawings. The trades on your jobsite shouldn’t have to translate the plans.

03

Code-first, not vibes

IBC 2024, IRC 2024, IECC 2024, plus every state amendment we have encountered. We cite section numbers in our notes and we keep the books on the desk.

04

Transparent fees

Fixed-fee on 80% of work. Hourly only when scope can’t be defined upfront. No mystery invoices, no surprises at change-order time.

The studio

Eight people. Phoenix-based. Drawing nationwide.

We staff every project with a senior drafter as principal-in-charge. No offshoring, no contractors stitched together at the last minute.

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

About — Architectural Drafting Studio · Nationwide · Archipartners Design