Immediate stop signals

If you see ANY of these on the walkthrough, do not sign.

  • You smell gas, see burnt wiring, or see blackened / charred hood areas.

  • The exhaust fan is missing, disconnected, or shaking violently.

  • The seller refuses to provide hood / fire / grease records.

  • You must add major cooking equipment outside the existing hood.

  • The landlord will not allow roof, gas, electrical, or grease-interceptor work.

Universal walkthrough — four phases
  1. WALK

    Smell, look, listen

  2. PROVE

    Hood · gas · electrical · plumbing

  3. PRICE

    Written scopes before signing

  4. NEGOTIATE

    Or walk away

The universal go / no-go

The universal go / no-go — five systems, every cuisine

Green items can be reused. Yellow items need a written contractor quote before signing. Red items must be resolved before the lease or purchase closes. This grid is the same across all 20 cuisine manuals — what changes is what counts as green vs. red for your specific menu.

  • Menu-to-equipment match

    GREENHot appliances fit under existing hood and at approved areas.

    REDMenu requires new hood or new utility service.

  • Type I hood + exhaust

    GREENStrong capture at hood edge, clean filters, service records on file.

    REDSmoke escape, grease on roof, missing service history.

  • Make-up air + pressure

    GREENDoors behave normally when hood runs; kitchen stays comfortable.

    REDSlamming doors, whistling, hot kitchen, smoke roll-out.

  • Fire suppression + gas

    GREENInspection tag current; meter and pipe sizes match equipment.

    REDOld tag, wrong nozzle coverage, undersized gas meter.

  • Electrical + plumbing + grease

    GREENPanel capacity, dedicated circuits, interceptor sized and pumped.

    REDPanel full, wrong voltage, interceptor overflowing or missing.

WHAT’S IN THE PACK

20 cuisine-specific manuals

Every cuisine has its own conversion landmine. Pick the closest match to your concept — the manual walks you through the equipment, hood, gas, electrical, plumbing, and code checks that apply to that menu specifically.

One email with the download links. We don’t sell your address; you can unsubscribe with one click.

AFTER YOU WALK THE SPACE

APD turns your field findings into permit-ready drawings.

Once you know the space can support the menu, you still need plans — code-compliant, contractor-bidable, fast enough to keep the deal on the rails. That’s what we draw. Operating in all 50 states; trilingual EN / ES / 中.

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

Restaurant Conversion Field Guide — 20 Cuisines, EN + ES · Archipartners Design