Back to portfolioProject · 006
CUSTOM HOME — RENDERING · TONOPAH, AZ · MMXXV
Tonopah New-Build Home
A single-story Spanish/Mediterranean new-build home rendered from the firm’s front elevation: a warm sand-stucco facade with a clay barrel-tile roof, stone-veneer wainscot, an arched recessed entry, and a tall RV/workshop garage bay beside the standard garage, set in Sonoran desert landscaping.
Gallery
Click any photo to view full size.



